CPV 42

CPV 42 Industrial machinery

Industrial plant, machinery, and specialist equipment tender activity under CPV division 42 across the UK public sector.

98live CPV 42 tenders open right now
Michael Kitt, founder and public procurement analyst at KimonBidsMichael Kitt··Data as of 23 Aug 2026

About CPV 42

CPV 42 is the Common Procurement Vocabulary division covering industrial machinery. It is one of the more specialised supply divisions in the vocabulary, and the public sector buys under it in narrower circumstances than it buys office equipment or vehicles.

The division covers machine tools and workshop machinery, materials handling equipment including cranes, hoists, and forklifts, pumps and compressors, furnaces and heat treatment equipment, filtration and separation plant, packaging and processing machinery, and industrial robots and automation equipment.

The buyers are organisations that run something industrial: research facilities, defence establishments, universities with engineering and physics departments, water and waste treatment operations, and transport maintenance depots. It is not a market that touches most public bodies, which makes it correspondingly less crowded for suppliers who serve it.

Active CPV 42 tenders

Live activity is driven by research infrastructure and by the replacement of ageing plant in operational facilities. Research equipment procurement is frequently tied to specific grant funding, which makes it time-bound and gives it delivery deadlines that are firmer than usual.

Materials handling equipment forms a steadier stream, bought by any organisation running warehousing, depots, or workshops. Water and waste treatment plant is procured by utilities under the utilities rules and by local authorities where they operate treatment facilities directly.

Active sub-category Typical procurement route Primary buyer pattern
Research and test equipment Grant-funded specialist competition University or research body
Materials handling and lifting Framework or open procedure Depot, warehouse, or estate operator
Pumps, compressors, and process plant Technical competition Utility, treatment facility, estate
Workshop and machine tools Below-threshold or open University, college, defence estate
Automation and robotics Bespoke specialist competition Research or advanced manufacturing body

Top buyers procuring CPV 42

The buyer base is concentrated and technical. In our own corpus the University of Strathclyde, the UK Atomic Energy Authority, the University of Sheffield, and the Ministry of Defence are among the more frequent publishers under this code, alongside major infrastructure joint ventures.

That concentration is the defining feature of this division commercially. A supplier does not need to cover the whole public sector to compete here; a small number of research-intensive universities, national laboratories, and defence establishments account for a large share of activity. Building relationships with technical and research procurement teams in those organisations is more productive than broad market coverage.

Typical contract values under CPV 42

The median notice sits around half a million pounds, consistent with a single significant machine or a small package of plant. The upper decile reaches into the tens of millions, covering major research facility equipment and large process plant installations.

Research equipment procurement has a distinctive commercial pattern: it is frequently funded by a specific grant with a fixed end date, which means delivery timescales are non-negotiable and late delivery can jeopardise the funding rather than simply attracting a penalty. Suppliers should treat stated delivery dates in this division as harder constraints than they would elsewhere, and should price lead time risk accordingly rather than assuming flexibility.

Compliance and certifications for CPV 42 bidders

Machinery safety compliance is the central requirement, with conformity assessment and marking appropriate to the equipment type, and a declaration of conformity covering the machine as supplied rather than its components. Where equipment is assembled or modified for the buyer, responsibility for conformity of the completed assembly must be clear, and buyers ask about this directly.

Lifting equipment attracts specific statutory examination requirements, and buyers require documentation demonstrating compliance and a plan for ongoing thorough examination. Pressure equipment carries its own conformity regime. Equipment for potentially explosive atmospheres requires appropriate rating and certification. Research and nuclear buyers apply supplier quality assurance regimes on top of general requirements, frequently requiring documented quality management, component traceability, and in some cases approval of the specific design before order. Suppliers should also expect requirements on commissioning, operator training, spares availability, and long-term technical support, since specialist plant is expected to remain in service for decades.

Frequently asked questions

Is there enough public sector volume in this division to be worth pursuing?

For a specialist supplier, yes, though it demands a targeted approach rather than broad market monitoring. The volume is concentrated in a modest number of research-intensive universities, national laboratories, defence establishments, and utilities. A supplier serving one of those segments will find a steady flow; a general industrial supplier scanning the whole public sector will find the division thin. The compensation for the narrow buyer base is that competition is correspondingly limited and technical capability weighs more heavily than price.

Why do delivery dates matter so much for research equipment?

Because the money is usually tied to a research grant with a fixed period. If equipment is not delivered, installed, and commissioned inside that window, the funding may be lost rather than simply delayed, and the consequences fall on the researcher and the institution rather than being absorbed contractually. Buyers therefore evaluate delivery credibility seriously and are wary of optimistic lead times. Suppliers who commit to realistic dates and evidence them, including component lead times, generally do better than those quoting the shortest programme.

How do supplier approval regimes at technical buyers work?

They typically require the supplier to demonstrate a quality management system appropriate to the criticality of the equipment, provide traceability of materials and components, and in some cases have the specific design reviewed and approved before manufacture. Approval is usually granted for a category of work rather than universally, so a supplier approved for one equipment class may need separate approval for another. The process takes months rather than weeks, which is why it must begin before an opportunity appears rather than in response to one.

Should I watch CPV 51 as well?

Yes, if installation and commissioning form a meaningful part of what you sell. Division 51 covers installation services for machinery and equipment, and a buyer purchasing installation separately from the machine will code it there. Because industrial plant frequently involves substantial installation and commissioning content, procurements are split between the two divisions inconsistently. Watching both, along with CPV 50 for the maintenance contracts that follow, gives a supplier the full picture of an asset's procurement lifecycle.

BuyerTitleValueClosing date
The Borough Council of Newcastle-under-LymeKnutton Lane Depot - Installation of New Air Conditioning£50,0002026-09-22
United Utilities Water LimitedSewer Flooding Mitigation Framework£20,780,0002026-09-28
Derry City and Strabane District CouncilT26-072ENV Replacement Boilerhouse Control Panel at Riversdale Leisure Centre2026-09-25
Transport for Wales Rail Limited (Utility Buyer)TFW1073.00 - Fluid Delivery System£250,0002026-09-21
Health and Safety ExecutiveReach Truck£21,0002026-09-08
Data as of 23 Aug 2026

Top buyers for this CPV

university of strathclyde

41 contracts

uk atomic energy authority

33 contracts

united kingdom atomic energy authority

27 contracts

anthro jv

20 contracts

university of sheffield

20 contracts

Top buyers for CPV 42

  • university of strathclyde
  • uk atomic energy authority
  • united kingdom atomic energy authority
  • anthro jv
  • university of sheffield

Get CPV 42 alerts

Free plan -- no credit card needed

Start free trial

Win more CPV 42 contracts

KimonBids monitors the UK procurement portals and alerts you to relevant cpv 42 industrial machinery contracts.

Find CPV 42 tenders free