About CPV 31
CPV 31 is the Common Procurement Vocabulary division covering electrical machinery, apparatus, equipment and consumables, and lighting. It is a supply division: the electrical products themselves, distinct from the installation work that fits them, which sits under CPV 45-3, and from the maintenance that follows, under CPV 50.
The division covers electric motors and generators, transformers and switchgear, power distribution equipment, cabling and wiring accessories, batteries and energy storage, lighting equipment and lamps, electrical insulation, and specialist electrical components.
Public sector demand under this code has been reshaped by two things: the replacement of lighting stock with LED and controlled lighting, which affects almost every estate owner, and the electrical infrastructure required to support vehicle charging and heat electrification. Both have turned what was a routine consumables market into one with substantial project-driven demand.
Active CPV 31 tenders
Live activity divides between consumable supply arrangements and project-driven equipment purchases. Consumable supply covers cable, accessories, and lamps bought in volume by organisations with direct labour forces. Project-driven purchases cover switchgear, transformers, standby generation, and energy storage bought for a specific scheme.
Standby and resilience power is a steady stream in its own right. Hospitals, data centres, control rooms, and custodial estates require assured power and replace generation and uninterruptible supply equipment on planned cycles.
| Active sub-category | Typical procurement route | Primary buyer pattern |
|---|---|---|
| Cable, accessories, and consumables | Term supply framework | Council, housing provider, university |
| Lighting and lighting controls | Project or framework purchase | Any estate owner, highways authority |
| Switchgear and distribution equipment | Project-specific competition | Large estate or infrastructure body |
| Standby generation and UPS | Bespoke competition | NHS, custodial, control room estate |
| Batteries and energy storage | Specialist competition | Research body, transport, utility |
Top buyers procuring CPV 31
The buyer base tilts towards technically specialised organisations more than most supply divisions. In our own corpus the UK Atomic Energy Authority, Transport for London, City Building Glasgow, and the University of Strathclyde are among the more frequent publishers under this code, alongside major contracting joint ventures.
That pattern reflects where non-standard electrical equipment is needed: research facilities with unusual power requirements, transport systems with traction and signalling power, universities with laboratory infrastructure, and large housing maintenance organisations buying consumables in volume. Highways authorities are a further significant buyer group through street lighting programmes, though these are frequently procured as supply and install rather than as equipment alone.
Typical contract values under CPV 31
The median notice sits around six hundred thousand pounds, but the distribution is unusually wide even by the standards of supply divisions, with the upper decile reaching well above a hundred million. That spread reflects the difference between a routine cable supply framework and a major infrastructure power equipment package.
Suppliers should distinguish carefully between term supply arrangements, where the value is an estimate of consumption over several years, and project purchases, where the value is a genuine single order. The two require different commercial approaches: term supply competes on catalogue pricing, delivery performance, and systems integration with the buyer's ordering process, while project purchase competes on technical compliance, lead time, and whole-life performance.
Compliance and certifications for CPV 31 bidders
Product conformity is the fundamental requirement, with appropriate conformity marking and declarations of conformity for the specific product and application. Buyers increasingly require evidence rather than assertion, particularly for safety-critical distribution equipment.
Equipment for specialised environments attracts additional requirements: explosive atmosphere rating where relevant, ingress protection ratings verified against the installed environment, and fire performance evidence for cabling in escape routes and high-risk buildings. Healthcare estates apply health technical memoranda to electrical infrastructure, particularly for clinical areas and standby power, and suppliers should expect these to be referenced rather than restated. Research and nuclear sites impose their own supplier assurance and quality regimes, frequently requiring approval before an order can be placed. Suppliers should also expect questions on lead times and supply chain resilience, which became a scored criterion during recent component shortages and has largely remained one, and on end-of-life and recycling arrangements for lamps and batteries.
Frequently asked questions
Is this a merchant market or a manufacturer market?
Both, depending on the sub-category. Consumables such as cable, accessories, and lamps are bought predominantly from distributors and merchants on term supply arrangements, where price, availability, and ordering systems decide the outcome. Specialist equipment such as switchgear, transformers, and standby generation is more often bought from or through manufacturers, because the technical specification and commissioning support matter more than catalogue breadth. Suppliers should be clear which market they are in, since the evaluation criteria differ substantially.
How has LED replacement changed demand under this code?
It created a large wave of replacement activity that is now maturing into a controls and connectivity market. The straightforward lamp-for-lamp replacement stage is largely complete in most public estates, and current procurement is more often about lighting control systems, emergency lighting compliance, and street lighting central management. That has raised the technical content of bids: buyers now ask about control protocols, integration with building management systems, and data rather than simply lumens and warranty. Suppliers competing on lamp price alone find fewer opportunities than a few years ago.
Why do research and nuclear buyers have separate approval processes?
Because equipment failure in those environments carries consequences that ordinary commercial warranty does not address, and because the technical requirements frequently sit outside standard product ranges. Organisations such as the UK Atomic Energy Authority operate their own supplier quality assurance regimes, often requiring documented quality management, traceability of components, and approval of the specific product for the specific application. These approvals take time and cannot be obtained inside a tender window, so suppliers targeting that market should begin engagement well in advance. The compensation is a small approved supplier pool and durable repeat business.
Should I watch CPV 31 or CPV 45-3?
Watch both if you supply and install. Division 31 covers the equipment as a product; group 45-3 covers building installation work. A buyer purchasing equipment for its own direct labour force to install codes under 31; the same buyer buying a complete installed solution usually codes under 45-3. Because many procurements are supply and install, the coding depends on how the buyer conceives the purchase, and a supplier watching only one will miss a substantial part of the relevant flow.
| Buyer | Title | Value | Closing date |
|---|---|---|---|
| The Royal Household | Automatic Fire Detection and Associated Equipment Installation, Maintenance and Reactive Repair at Windsor and London Estates | 2026-10-02 | |
| University Of Edinburgh | Non-Torque Loading System for Electrical Machine Testing Including Drive System | 2026-09-28 | |
| Derry City and Strabane District Council | T26-072ENV Replacement Boilerhouse Control Panel at Riversdale Leisure Centre | 2026-09-25 | |
| Pegasus Academy Trust | Pegasus Academy Trust - Dynamic Market for Supply of Energy | ||
| Science Museum Group | Hybrid Meeting Room Support | £17,000 | 2026-09-07 |
| Data as of 23 Aug 2026 | |||
Top buyers for this CPV
united kingdom atomic energy authority
16 contracts
transport for london
16 contracts
uk atomic energy authority
15 contracts
city building (glasgow) llp
15 contracts
ministry of defence
12 contracts
Top buyers for CPV 31
- united kingdom atomic energy authority
- transport for london
- uk atomic energy authority
- city building (glasgow) llp
- ministry of defence
Related CPVs
Win more CPV 31 contracts
KimonBids monitors the UK procurement portals and alerts you to relevant cpv 31 electrical equipment contracts.
Find CPV 31 tenders free